As a world class leader in tertiary education,Monash University’s new Learning and Teaching Building(LTB)needed a design that was going to be as dynamic and inspirational as the courses it offers.
Comprising of four floors,the building hosts 65 formal and information learning and teaching spaces,including tutorial and lecture rooms,specialist teaching spaces and break-out areas;focused around the University’s vision of‘Better Teaching,Better Learning’.
The new building is the largest infrastructure development program undertaken for the Clayton Campus and was designed by John Wardle Architects;well-renowned for their work on iconic projects such as the Westfield Sydney Commercial Tower,Melbourne Conservatorium of Music and 900 Ann Street,Brisbane.Paying homage to the history of the Clayton site,the design encompasses the changes in theme over time;as indigenous bushland,colonial farmland,suburban subdivision and finally a university campus.
Construction of the 30,000sqm facility was awarded to Multiplex Builders and has sustainable design and construction at its core,gaining a 5-star rating from the Green Building Council of Australia.With a build cost of$220 million,Multiplex enlisted ARC Plastering for their knowledge,expertise and capability to provide a high-quality fit-out within the time constraints of the project.With up to 150 interior contractors on site at the construction peak,ARC Plastering thrived on this dynamic and exciting project.
As a Design and Construct project,the modern architectural elements of the design-led Multiplex and ARC Plastering to seek out Hopestar Building Systems®as their wall and ceiling systems manufacturer,to work in partnership with and provide innovative engineering solutions and dedicated technical advice throughout the sometimes challenging project.
Hopestar wall and ceiling systems were used throughout the construction of the Learning and Teaching Building and the Hopestar engineering team worked with Multiplex and ARC Plastering to provide the optimal structural framing systems were used for each section of the build.
Let’s grow together.We have advanced production equipment,leading production techniques,and strictly quality control.And We manufacture products from high-quality steel coils,products,and sales service make as your one-stop decoration construction supply shop.Hopestar Building is the senior steel manufacturer,the factory has more than 50 sets of production lines for galvanized steel profiles,T grid,and Accessories.The annual product quantity is 20,000 Tons.The factory has developed business with South America,Europe,Africa,and Oceania.we supply and have a commitment to making customers’projects a reality.