0
image
image
Suspension Ceiling Channe

Metal Steel Framing Suspension Ceiling Channel System/Main channel

8mm cement board
Delivery
FOB
minimum order
2000 tons
Supply Ability
1500tons / Month
Country of Origin
Xingang, Tianjin Port
Stock Time
20-25 days after receiving the depositDay
Quantity:
USD0.50 - USD0.55 / tons
Contact Now
add to cart

Metal Steel Framing Suspension Ceiling Channel System/Main channel

Product Description

 Metal Steel Framing Suspension Ceiling Channel System/Main channel:

Packaging & Shipping

Packaing and shipping of Metal Steel Framing Suspension Ceiling Channel System/Main channel:

pictures of loading.jpg

FAQ

1.Q: Where is your company located? How can I visit there?

A: Our factory is located in LangFang City, China, about one hour from beijing by train. All our

clients at home and abroad are warmly welcome to visit us!

2. Q: Can I get some samples?

A: Yes,we are honored to offer you samples.

3. Q: How does your factory do regarding quality control?

A:"Quality is priority. Our factory always attach great importance to quality controlling from the

very beginning to the end. Our factory has gained ISO Authentication. We guarantee the goods

out from our factory 100% qualified. And each process, we have very strict operation and arrange

two technicians to inspect. After the products are finished, we will make the last test to pick up the unqualified products.

4. Q: Regarding to your high quality products, are your price high?

A: Indeed, our quality is available and competitive because we take more automatic operation

to decrease human cost.

5. Q: If we place you the order, will you delivery on time?

A: We deliver the goods on time. The timely delivery is our focus, and we will make sure each lot

is shipped on time displayed in the contract.